06 / Projects & Delivery

Take an approved finding through to an accepted handover.

Turn technical decisions into defined work packages and coordinated delivery. We connect scope, procurement, planning, contractor interfaces and completion evidence under agreed owner decision points.

The challenge

When the records
and the work drift apart.

A finding is not yet a work package. Execution needs a defined boundary, clear interfaces, an agreed budget basis and a realistic route through access, materials and site permissions. We help prepare those conditions and maintain control as the work develops.

Typical starting points

01A technically approved action still has no executable scope or acceptance criteria.

02Contractor scopes overlap, or important interfaces fall between packages.

03Changes and completion documents are not reflected in the budget or handover status.

The work

A defined route through
your scope.

01

Frame the decision and scope

Clarify the required outcome, technical basis, exclusions and owner approvals. Where needed, define the study or specialist engineering required before execution can be planned.

02

Prepare the work and commercial basis

Develop work packages, schedule assumptions, procurement input and budget structure. Identify the site readiness conditions and discipline interfaces.

03

Coordinate execution and change

Track progress, constraints, contractor interfaces and agreed changes. Make the effect on cost, timing and acceptance visible for owner decisions.

04

Complete the handover

Reconcile punch items, completion evidence and acceptance. Prepare the updated asset records and define who owns any residual actions.

What you receive

Outputs your team
can put to work.

The final deliverable set and acceptance requirements are agreed for your assignment.

01 / DELIVERABLE

Decision and scope brief

Required outcome, technical basis, boundaries, assumptions and approval gates.

02 / DELIVERABLE

Execution-ready work package

Defined work, interfaces, readiness conditions, schedule and budget basis.

03 / DELIVERABLE

Progress and change record

Current status, constraints, approved changes and the decisions still required.

04 / DELIVERABLE

Accepted handover dossier

Completion evidence, resolved or assigned punch items and asset-record updates.

From finding to evidence

Illustrative workflow · not a client case
01

Finding

A maintenance recommendation spans mechanical work, scaffolding, insulation and electrical interfaces.

02

Agreed action

Create one agreed package with clear discipline boundaries, readiness conditions and owner approval gates.

03

Closure evidence

Accepted completion dossier, approved changes and assigned residual actions in the asset record.

Clear responsibilities

Agree the roles
before the work.

The contract defines whether IntegriCore provides preparation, coordination or an agreed delivery scope. Construction, engineering authority, statutory inspection and independent verification are explicitly allocated. The owner retains operational permission, budget approval and final acceptance.

How owner decisions are built in

Scope questions

Before we start.

Is this only for work arising from inspections?

Inspection follow-up is a natural starting point. The same approach can support maintenance events, engineering studies and defined brownfield or greenfield project scopes, with responsibilities agreed for that assignment.

Can you work with contractors we already use?

Yes. Existing contractors can remain in place. The scope should make their interfaces, responsibilities and completion requirements clear.

When can you provide a reliable price and schedule?

Once the scope, information quality, specialist requirements and site constraints are sufficiently defined. Early estimates must identify their assumptions and exclusions; they are not unconditional delivery commitments.

Start with a conversation

Let’s make the next step clear.

One discipline, one defined scope, or a wider integrity programme.
Tell us where your team needs support.