Reconcile records and scope
Map the agreed equipment population to available inspection records and supporting documentation. Identify missing references, evidence and scope boundaries for review.
02 / ATEX & Electrical
Connect your Ex equipment records, inspection findings and corrective work. We help structure the inspection scope, organise follow-up and assemble the evidence needed for an accepted close-out.
The challenge
Hazardous-area equipment records, inspection reports and maintenance histories often develop separately. A missing equipment reference, incomplete document or unassigned action can leave a finding unresolved long after it has been recorded. We bring the follow-up into one manageable programme.
01The Ex register and the equipment recorded in inspection reports do not align.
02Open deviations lack an agreed priority, responsible person or remedial scope.
03Corrective work has been carried out, but the required verification or supporting record is missing.
The work
Map the agreed equipment population to available inspection records and supporting documentation. Identify missing references, evidence and scope boundaries for review.
Agree the responsibilities of the owner and competent ATEX specialists, the inspection basis and how findings will be recorded. Keep technical assessment distinct from administrative completion.
Convert approved findings into defined electrical and instrumentation work packages. Coordinate materials, access, work permissions, interfaces and the verification required after the work.
Link the corrective action, completion record, verification result and owner acceptance. Prepare the agreed updates to the Ex register and maintenance system.
What you receive
The final deliverable set and acceptance requirements are agreed for your assignment.
A traceable view of missing equipment references, inspection records and supporting documents.
Findings connected to source evidence, review status, priority, ownership and target dates.
Agreed remedial work, discipline interfaces, access conditions and verification requirements.
Completion and verification records connected to the original finding and equipment reference.
From finding to evidence
Illustrative workflow · not a client caseAn Ex equipment finding is recorded, but the supporting record and follow-up owner are missing.
Confirm the equipment reference, obtain the specialist review and assign the approved corrective scope.
Linked assessment, completed work record, required verification and accepted register update.
Clear responsibilities
The assignment defines which competent specialists inspect, assess and verify the work. Equipment certification, hazardous-area classification and formal conformity decisions are separate specialist responsibilities unless explicitly included. No website enquiry establishes that equipment or a site is compliant.
How owner decisions are built inScope questions
This service concerns the organisation of records, inspection follow-up and agreed remedial work. Certification or formal conformity assessment must be explicitly scoped with an appropriately authorised party.
Yes. A defined backlog or equipment area is a useful starting point. We first agree the source records, ownership, required specialist input and what counts as accepted completion.
Electrical and instrumentation remedial work can form part of the agreed scope. Competence, work permissions, execution responsibilities and independent verification requirements are established before work starts.