In practice

What makes a finding
ready to close?

A piping condition that still needs assessment. An unresolved Ex finding. A tank recommendation without an execution plan. Each needs a different technical scope, but the same discipline in decisions and evidence.

Explore these typical situations to see how we connect specialist input, owner approvals, work preparation and handover. They illustrate our delivery model, rather than completed client assignments.

Explore a typical findingChoose a discipline

Inspection basis to agree

Damaged insulation. An unresolved condition.

Finding
An inspection report records damaged cladding on a pipe run. The condition beneath the insulation has not yet been established.
Decision
Confirm the asset reference and required specialist inspection. The owner agrees the priority, access window and budget basis.
Work package
After the technical assessment, prepare any approved corrective scope with the mechanical, coating, insulation and access interfaces defined.
Closure evidence
Link inspection results, accepted repair records and reinstatement checks to the finding. Prepare the asset-record update for client acceptance.
What changes for your team

The unknown condition becomes an agreed inspection scope, followed by controlled corrective work where required.

Explore piping support

Specialist review required

An Ex finding. No agreed route to closure.

Finding
An Ex inspection report flags an equipment or record discrepancy. The action has no clear owner or agreed evidence for closure.
Decision
A competent Ex specialist establishes the technical basis. The owner agrees the action, priority and conditions for the work.
Work package
Prepare the approved electrical scope for appropriately competent contractors, with responsibilities and verification requirements assigned.
Closure evidence
Reconcile the corrective-work records and required verification with the Ex register. Submit the update and closure evidence for acceptance.
What changes for your team

The open finding has a named owner, a defined remedial scope and an agreed verification route.

Explore ATEX support

Maintenance scope to define

A tank recommendation. No delivery plan.

Finding
A tank inspection report recommends follow-up. The recommendation has not yet been translated into an approved maintenance package.
Decision
Confirm the inspection basis and specialist recommendations. The owner agrees the maintenance window, budget and package boundaries.
Work package
Coordinate the agreed tank specialist and contractor scopes. Connect access, mechanical and coating interfaces to readiness and handover requirements.
Closure evidence
Bring accepted work records, required inspection evidence and residual actions together in the tank dossier and proposed asset-record update.
What changes for your team

The recommendation becomes a coordinated maintenance scope with an explicit route to an accepted handover.

Explore tank support

Illustrative scenarios based on our delivery model. Not client case studies.

The handover test

Can the next person
follow the record?

An accepted handover should connect the original asset and finding to the technical basis, approved scope and evidence of completion.

  • The source and asset reference can be traced.
  • The decision, owner and approval basis are recorded.
  • The agreed work and any authorised changes are reconciled.
  • Required verification is complete and residual actions have owners.
  • The asset-record update is validated and accepted by the client.

A work-order status alone does not establish that these acceptance requirements have been met.

Explore asset data and CMMS

Start with a conversation

Let’s make the next step clear.

One discipline, one defined scope, or a wider integrity programme.
Tell us where your team needs support.