Locate the work.
Falcker’s Site Explorer links site imagery with tagged assets and related information, helping teams discuss the same location.
Industrial asset integrity
From the finding in your inspection report to the work, decisions and evidence that close it.

Tank terminals Bulk liquid storage Chemical & process sites
The NetherlandsOur expertise
Six connected streams. Each with a defined scope, practical deliverables and clear responsibilities. Start with one, or bring them together in a wider programme.
Inspection programmes, repair scopes and traceable close-out for piping and pressure equipment.
02Ex equipment records, inspection follow-up and coordinated electrical remedial work.
03A coordinated route from tank inspection output to maintenance scope and accepted evidence.
04Scope definition, proof-test coordination and evidence management with agreed specialists.Specialist-supported scope
05Asset references, work-order quality and accepted evidence aligned with your maintenance system.
06Work preparation, contractor coordination and controlled handover for maintenance and projects.
From finding to follow-through
An open action needs a reliable technical basis, a responsible owner and a scope that can actually be delivered.
Explore three common situations. See how the decision, work package and closure evidence connect, and where your asset team remains in control.
What an accepted handover needsInspection basis to agree
The unknown condition becomes an agreed inspection scope, followed by controlled corrective work where required.
Specialist review required
The open finding has a named owner, a defined remedial scope and an agreed verification route.
Maintenance scope to define
The recommendation becomes a coordinated maintenance scope with an explicit route to an accepted handover.
Illustrative scenarios based on our delivery model. Not client case studies.
How we work
Explore each stage to see what moves the work forward, what your team receives and which decisions remain yours.
The starting point
Understand
Bring asset references, inspection reports, open actions and maintenance records together. Check what can be relied on and what needs clarification before the next scope is agreed.
Confirm the scope, available information and specialist input needed.
A shared basis for the next decision, with uncertainty visible from the start.
A decision-ready backlog
Prioritise
Bring together the specialist assessment, deadlines, operating constraints and available work windows. Agree the priority, responsible owner and next action for each finding.
Approve the priorities, action ownership and initial budget direction.
A clear order of work and a visible record of the decisions still needed.
The agreed scope
Prepare
Translate the approved action into a defined work package. Bring mechanical, coating, insulation, access and electrical interfaces together where relevant, with clear completion requirements.
Approve the scope, budget and release conditions before execution.
A package that contractors can plan, price and deliver against the same basis.
Control during delivery
Deliver
Coordinate the agreed contractors and specialist roles. Track constraints, progress and changes against the approved scope, so the asset team can act on exceptions while work is in progress.
Authorise changes and resolve exceptions within the agreed responsibilities.
A traceable account of what changed, why it changed and who agreed it.
Evidence of completion
Close
Reconcile completion records, specialist verification and any residual actions. Prepare the asset or CMMS update and record the client’s acceptance of the handover.
Accept the handover and the responsibility for any remaining actions.
A defensible route from the original finding to the updated asset record.

A practical starting point
The Integrity Control Baseline is a paid, defined first assignment. It brings status, gaps and open actions into an agreed plan for your asset team.
Our technology partner · Falcker
Falcker develops software for visual asset information, inspection records and maintenance planning at industrial sites.
Where included in your assignment, its visual information helps locate an asset and understand the surrounding work area. We connect that context to the scope, people and decisions needed to move the work forward.
Falcker’s Site Explorer links site imagery with tagged assets and related information, helping teams discuss the same location.
We bring the relevant findings, specialist input, access needs and contractor interfaces into a defined scope.
Your team approves the priorities, budget and work window. Delivery responsibilities and information handovers are agreed for the assignment.
Start with a conversation
One discipline, one defined scope, or a wider integrity programme.
Tell us where your team needs support.